
Oxford Station – western side
A new track, platform, ticket hall and wider bridge over Botley Road.
… Learn more about Oxford Station – western side
Oxford Station – eastern side
A new track and platform, main station building, bus interchange and walking and cycling provision, including an enhanced public realm and new pedestrian and cycle bridge over Botley Road.
… Learn more about Oxford Station – eastern side
Cowley Branch Line
Reopening of passenger services on the branch line, with two new stations to Oxford’s South and East, 7 and 9 minutes from Oxford Station, with potential for direct services through… Learn more about Cowley Branch Line

Central Oxfordshire Travel and Connectivity Schemes
Providing more space and reliability for buses and active travel through bus priority and traffic congestion management measures.
… Learn more about Central Oxfordshire Travel and Connectivity Schemes
Oxford Flood Alleviation Scheme
One of the biggest flood schemes currently planned in England. Working with the natural floodplain to the west of Oxford, the scheme will create a new stream and lowered flood… Learn more about Oxford Flood Alleviation Scheme

River Thames Bridge and path works
A new river bridge for cyclists and pedestrians connecting Osney Mead to Oxpens.
… Learn more about River Thames Bridge and path works
Burying or diverting power lines
Osney Mead is crossed by two power lines that could be buried or diverted.
… Learn more about Burying or diverting power lines
The Energy Systems Accelerator
A new multi-disciplinary hub, the first of its kind in the UK, where organisations can come together to innovate in zero carbon energy systems. Established by the University of Oxford,… Learn more about The Energy Systems Accelerator